HV Testing and Commissioning Services
Scroll Top

Testing & Commissioning

When it comes to Testing & Commissioning, our clients count on us to get the job done. Done Safely and Done Right!

TESTING & Commissioning
An engineered approach

Our meticulously engineered client-specific Commissioning Plans,
Check Sheets and Test Reports help substations transition through
to energization in a safe, logical & step-by-step manner.


Power Transformers

Power Transformer Tests:

  • Turns Ratio (TTR)
  • Excitation Current
  • Insulating Oil Tests (Dissolved Gas Analysis (DGA) & Standard Oil Test)
  • DC Winding Resistance
  • Vector Group
  • Insulation Resistance
  • Insulation Power Factor/ Dissipation Factor/ Tan Delta (Tanδ)
  • Zero Sequence Impedance
  • Sweep Frequency Response (SFRA)
  • Primary Through Injection
  • Transformer Differential Stability
  • Tap Changer Continuity & Ratio
  • Calibration of thermal sensors
  • Standard Oil Test and Dissolved Gas Analysis (DGA)
  • Ancillary Protection Testing


Current Transformers

  • CT Polarity
  • CT Circuit Continuity
  • CT Ratio & Phase Error
  • CT Secondary DC Resistance 
  • CT Excitation/Magnetisation Curve 
  • CT Primary & Secondary DC Insulation Resistance
  • CT Burden Measurement
  • Three-Phase Primary Injection
  • CT Knee Point Current & Voltage Measurements


Voltage Transformers

  • VT Polarity 
  • VT Circuit Continuity
    VT Ratio
  • VT Burden
  • VT Primary & Secondary Insulation Resistance
  • VT Phase and Magnitude Error
  • VT Excitation curve
  • VT Winding resistance
  • VT Secondary burden
  • VT Dielectric withstand/ HiPot


Generators

  • Stator DC Winding Resistance
  • Stator Zero, Positive & Negative Sequence Impedance
  • Rotor AC and DC impedance
  • DC Insulation Resistance & Polarisation Index
  • Insulation Power Factor/ Dissipation Factor/ Tan Delta (Tanδ)
    Partial Discharge


Earthing Systems

  • Soil Resistivity
  • Earthing Inspection
  • Earth Grid Continuity
  • Current Injection Testing (CIT)
  • Step and Touch Potential
  • Earthing System Resistance


Circuit Breakers

null

  • Static Contact Resistance
  • Dynamic Contact Resistance
  • Coil Current Analysis
  • Charging Motor Current Analysis
  • Motion/Contact Travel Test
  • Under-Voltage Condition Test
  • Circuit Breaker Timing
    Minimum Pick-up
  • Insulation Power Factor/ Dissipation Factor/ Tan Delta (Tanδ)
  • Circuit Breaker Trip & Open Checks
  • DC Insulation Resistance
  • Online Partial Discharge
  • Protection Relay Trip Checks


Busbars

null

  • Online Partial Discharge
  • Contact Resistance
  • Insulation resistance
  • High Voltage Withstand (HiPot)
  • Primary Injection
  • Bus Zone Differential Stability


Isolators & Earth Switches

  • Contact Resistance
  • Insulation Resistance


Surge Arrestors & HV Bushings

  • Contact Resistance
  • Insulation Resistance
  • Insulation Power Factor/ Dissipation Factor/ Tan Delta (Tanδ)


Power Lines

  • Positive & Zero Sequence Impedance
  • Earth Fault Current Compensation Factor
  • Mutual Coupling between Parallel Lines,
  • Coupling impedances between power lines, signal cables & pipelines


High Voltage Cables

  • High Voltage Withstand (VLF)
  • VLF Tan Delta / Dissipation Factor
  • Sheath Withstand
  • Online Partial Discharge
  • DC Insulation Resistance

RECENT PROJECTS

From commissioning Utility-scale Renewable Generation to Mission Critical High Voltage Power networks, Integral Power has been at the forefront in the power industry, Leveraging High Voltage Expertise to create value for customers.

TRANSFORMER ASSEMBLY









TRANSFORMER ASSEMBLY

Commissioning & Energization

TAILEM BEND SOLAR FARM









TAILEM BEND SOLAR FARM

Commissioning & Energization

CROOKWELL WIND FARM









CROOKWELL WIND FARM

Commissioning & Energization

SUNRAYSIA SOLAR FARM









SUNRAYSIA SOLAR FARM

Commissioning & Energization

NEVERTIRE SOLAR FARM









NEVERTIRE SOLAR FARM

Commissioning & Energization

NEVERTIRE SUBSTATION









NEVERTIRE SUBSTATION

Commissioning & Energization

NEVERTIRE SUBSTATION







NEVERTIRE SUBSTATION NEVERTIRE SOLAR FARM







NEVERTIRE SOLAR FARM SUNRAYSIA SOLAR FARM







SUNRAYSIA SOLAR FARM CROOKWELL WIND FARM







CROOKWELL WIND FARM TAILEM BEND SOLAR FARM







TAILEM BEND SOLAR FARM TRANSFORMER ASSEMBLY







TRANSFORMER ASSEMBLY






VIEW ALL PROJECTS