PROJECT Fast facts
The 125MW Tailem Bend Solar Farm is one of the first large utility-scale Solar Farms built in regional South Australia. Consisting of 390,000 solar panels, the project delivers sufficient power to meet the annual need of over 40,000 homes. Integral Power was engaged by UGL to carry out High Voltage Testing, Commissioning, and Energisation of the entire Solar Farm.
- Construction Validation, Detailed Functional and Wiring Checks
- Primary Testing & Commissioning of High Voltage Collector Switchboards
- Primary & Secondary Injection Testing of the Solar Farm Protection Schemes
- Step and Touch Potential Validation across the Solar Farm
- Site Acceptance Testing of over 50 x Inverter Transformers
- SCADA Integration Testing in conjunction with TNSP
- High Voltage Switching and Back Energisation Services
CLIENT Testimonials
Greg Godfrey
We engaged Integral Power to carry out the full commissioning of the Nevertire Solar Farm (NSF/NVS) 22 & 132kV substations in regional NSW. They were very professional and thorough in their approach. Even though the site was still under construction when they started the pre-commissioning works, maintained their focus on safety with attention to detail.
Bradd Sheridan
Operations Manager, FREDON
HOSSEIN AFSHARMEHR
Project Manager, VEOLIA WATER
ISSAC FERNANDEZ
Project Engineer, ELECNOR AUSTRALIA
Paul Premrel
Genral Manager, ALTRAD SERVICES
RECENT PROJECTS
From commissioning Utility-scale Renewable Generation to Mission Critical High Voltage Power networks, Integral Power has been at the forefront in the power industry, Leveraging High Voltage Expertise to create value for customers.