Client: BIOSAR Engineering Location: Nevertire, NSW Sector: Renewable Energy

PROJECT Fast facts

The 132kV Nevertire Substation is an AIS installation, purpose-built to evacuate 130MW from renewable generation from the adjacent Nevertire Solar Farm. NVS connects Dubbo & Nyngan load centers in Central NSW. The installation consisted of a 132kV Switchyard housing dead tank Circuit Breakers along with CTs, VTs, and associated Busbars, Disconnectors and Earth Switches.

  • Installation & Testing of 3 x 132kV Dead Tank CBs along with their associated CTs and VTs
  • Installation & SAT Testing of 150MVA, 132kV Power Transformer, and associated ancillaries
  • Installation and Injection Testing of the 132kV NVS Substation Earth Grid
  • NATA Testing of all Metering Transformers (CTs and VTs)
  • Installation & Primary Testing of 132kV Disconnectors and Earth Switches
  • Primary & Secondary Injection Testing of the NVS Protection Schemes
  • SCADA Integration Testing of Protection & Control architecture with TNSP
At a Glance

Project Outcomes

  • Testing & Commissioning
  • SCADA System Integration
  • Grid Connection Services
  • Solar Farm Energization

Value Proposition

  • On time completion
  • Within allocated budget
  • Flawless Safety record
  • Ongoing operations &
    maintenance support
0
NSW
0
RENWABLE
0
Q4 2021
0
BIOSAR

CLIENT Testimonials

RECENT PROJECTS

From commissioning Utility-scale Renewable Generation to Mission Critical High Voltage Power networks, Integral Power has been at the forefront in the power industry, Leveraging High Voltage Expertise to create value for customers.